Confidential Client

Satellite Assembly Clean Room, Sunnyvale, CA

Gordon Prill services: Architectural Design, MEP Engineering and Construction

  • A 158,000 sq. ft. facility was modified and added onto from an existing 115,000 sq. ft. machine shop
  • 15,000 sq. ft. are offices and 85,000 sq. ft. includes a Class 100,000 clean room
  • Also includes Thermal Vacuum Chambers, Acoustical Testing Cell, Vibration Shaker System and Planer Nearfield Test Range